Bowling Group Northland New Zealand

Steve Bowling Contracting | SSP Engineering | NPM Remediation |
NPM Construction | GHK Piling |

  • Home
  • About Us
  • Our Team
  • Business Units
    • Steve Bowling Contracting
    • SSP Engineering
    • NPM Remediation
    • NPM Construction
    • GHK Piling
  • Projects
  • Compliance
  • Contact Us

Projects by Steve Bowling Contracting

Kirikopuni Bridge

Kirikopuni Bridge

Kirikopuni Bridge Upgrade was a contract to replace structural steel components to the trusses under the bridge, along with the replacement of rivets & other associated components. The works involved provision of full scaffold access to the truss, removal of and treatment of corrosion at the sides of the deck support beams at deck joints (83 … [Read more...]

Helena Bay Concrete Roadway

Helena Bay Concrete Roadway

Steve Bowling Contracting were awarded the contract to complete 255m of concrete roadways by Fulton Hogan in 2015. The up to 5m wide concrete roadway was to create access to the house sites throughout a subdivision. The concrete driveways were over farmland. This meant that there were a multitude of different contours, corners & elevations … [Read more...]

Hatea Loop Jetty Refurbishment

Hatea Loop Jetty Upgrade

This contract was with Whangarei District Council for the refurbishment of the existing jetty on the Hatea Loop, a popular walking, running and cycling track. The works involved pile driving, demolition of some of the walkway and jetty, decking, kerbing, handrailing and other works. All of this was to be managed while ensuring the access to the … [Read more...]

Glenbervie School Special Needs Access

Glenbervie School Special Needs Access

Stage 1 – Construction of accessible ramp to pool and courts, provide pool hoist, change table, and threshold ramps. The project was to build a series of complicated ramps, steps and platforms to cater for children with disabilities at the school. The works carried out included demolition of existing pavement and stairs, bulk earthworks to new … [Read more...]

Frying Pan Corner Lookout Structure

Frying Pan Corner Lookout

This contract was tendered to Whangarei District Council for the renewal of the Frying Pan Corner Lookout Structure which is an existing lookout point situated beside Matapouri Road between Ngunguru and Tutukaka. The existing lookout structure was constructed by the Lions Club around 10 years ago, and had deteriorated to a state where it was unfit … [Read more...]

  • « Previous Page
  • 1
  • 2
  • 3
  • 4
  • Next Page »

Phone: (09) 435 2119
Fax: (09) 435 2469
9-11 Hewlett Street, Whangarei
Email Us

KEY PERSONNEL

Dean Collinson, General Manager
Ben Bowling, Construction Supervisor
Steve Bowling, Managing Director
Cameron Lornie, Projects Engineer
Brett Snell, Construction Supervisor

Recent Projects

Riverside One Apartments

One Riverside Apartments

Tarewa Park Wastewater Storage Tanks

Tarewa Park Wastewater Storage Tanks

Whau Valley Retaining Wall

Whau Valley Retaining Wall

More Projects...

What Our Customers Say

  • ““To their credit, the staff of Steve Bowling Contracting worked with the MOE/School (and specific student’s needs), the design team and us as project managers to deliver a project we are all immensely proud of.” Trevor Griffiths – Director, Griffiths and Associates, May 2015 Read more...
  • “The project was completed on time and the playing surface has been well received by our hockey community...” Grant McLeod – CEO, Northland Hockey Association – 30 October 2015Read more...
  • "I just want to say how happy we are with the job you did. We were impressed with the way the guys worked and presented themselves on the job and how they were prepared to deal with my requests during it." Wayne McKeanRead more...

Contracting Services

  • Reinforced Concrete Structures
  • Precast Installation and Erection
  • Concrete Driveways
  • Concrete Repairs
  • Demolition
  • Site Works, Excavation and Drainage Services
  • Retaining Walls
  • Bridge Construction, Upgrades and Repairs
  • Guardrails
  • Specialist Industrial Coating and Epoxy Systems
  • Industrial Shutdowns
  • Seismic Upgrades & Strengthening

Systems & Compliance

Bowling Infrastructure Group considers it imperative that all staff return home to their families fit and healthy at the end of each day, the impact of our works on the environment is minimised, and that our projects are constructed to specification, … More info...

Business Units

  • Steve Bowling Contracting
  • SSP Engineering
  • NPM Remediation
  • NPM Construction
  • GHK Piling

© Copyright 2015 Bowling Infrastructure Group, 9-11 Hewlett Street, Port Whangarei · Login

Copyright © 2025 · Bowling Infrastructure Group, 9-11 Hewlett Street, Port Whangarei, 0110 · Email Us · Website Managed By Honey Pot Digital · Log in