Bowling Group Northland New Zealand

Steve Bowling Contracting | SSP Engineering | NPM Remediation |
NPM Construction | GHK Piling |

  • Home
  • About Us
  • Our Team
  • Business Units
    • Steve Bowling Contracting
    • SSP Engineering
    • NPM Remediation
    • NPM Construction
    • GHK Piling
  • Projects
  • Compliance
  • Contact Us
You are here: Home » GHK Piling » Marine Structures

Marine Structures

GHK Piling have a long history in not only piling on land but also in the marine environment. We are construction experts in all types of concrete, timber and steel marine structures. We are familiar with the difficulties of working over water and are able to develop a solution to ensure a project is completed safely and on time, without compromising quality.

Because of our experience in the Northland area we are often aware of the ground conditions and required methodologies prior to a geotechnical investigation of the site.

“The GHK team did a great job on the install of our piles and sea wall for our Travelift piers. The finished product was built to spec and was well finished off, leaving the site clean, tidy and well presented.” – 

Brad Hall – General Manager – Oceania Marine Ltd

Get in touch with our team to discuss your marine project.

 

Recent Projects

Oceania Marine 100T boat lift

  • IMG_0800 – Copy
  • IMG_2178
  • IMG_2195
  • IMG_2224 – Copy

 

Hatea Loop Jetty

  • IMG_4347
  • IMG_4360
  • IMG_4362

 

Kotuitui Whitinga Footbridge

  • GHK Waiarohia Stream Footbridge
  • GHK Waiarohia Stream Footbridge
  • GHK Waiarohia Stream Footbridge
  • GHK Waiarohia Stream Footbridge


Phone: 09-435 4443
9-11 Hewlett Street, Whangarei
Email GHK

KEY PERSONNEL

Marty Stam, Construction Manager
Steve Bowling, Managing Director
Cameron Lornie, Projects Engineer

What Our Customers Say

  • “…A huge congratulations to all of you for your commitment to the construction of this project and its various elements…” Paul Dell – Whangarei District Council, Group Manager District Living Read more...
  • “The GHK team did a great job on the install of our piles and sea wall for our Travelift piers. The finished product was built to spec and was well finished off, leaving the site clean, tidy and well presented...” Brad Hall – General Manager – Oceania Marine Ltd Read more...

Recent Projects

William Fraser Memorial Park Sports Field Lighting Tower Foundations

William Fraser Memorial Park Sports Field Lighting Tower Foundations

Waimatenui Bridge

Waimatenui Bridge

Tirohanga Cycleway Bridge

Tirohanga Cycleway Bridge

More Projects...

Piling Services

  • Driven Piles
  • Bored Piles
  • Bridges
  • Retaining Walls
  • Marine Structures
  • Palisade Walls

Systems & Compliance

Bowling Infrastructure Group considers it imperative that all staff return home to their families fit and healthy at the end of each day, the impact of our works on the environment is minimised, and that our projects are constructed to specification, … More info...

Business Units

  • Steve Bowling Contracting
  • SSP Engineering
  • NPM Remediation
  • NPM Construction
  • GHK Piling

© Copyright 2015 Bowling Infrastructure Group, 9-11 Hewlett Street, Port Whangarei · Login

Copyright © 2025 · Bowling Infrastructure Group, 9-11 Hewlett Street, Port Whangarei, 0110 · Email Us · Website Managed By Honey Pot Digital · Log in