Paihia School required the removal of asbestos containing fibre cement sheeting from the exterior of a number of their classrooms, to allow for renovation and re-cladding of these areas. This involved NPM Remediation to perform work during weekend hours so as not to put any Paihia School students at risk.

A Geotextile apron was laid beneath the sheets to prevent any debris from contaminating the area during the removal process. The Asbestos sheets were removed using hand tools and suppression equipment and loaded into the back of a truck double wrapped in 200µm plastic.

After the removal area was vacuumed using equipment with specific asbestos filters and cleared by an accredited Asbestos assessor.  Black polythene was installed over the exposed framing to ensure it was protected from inclement weather until cladding could be reinstated.

The school & project manager were very happy with the outcome of the project.

 

  • 20181216_133200
  • 20181216_131521
  • 20181216_131543
  • 20181215_104810
  • 20181215_085900
  • 20181214_112554
  • 20181214_111005

NPM Remediation

Phone: 09 435 9014
9-11 Hewlett St, Whangarei
Email Us

KEY PERSONNEL

Paul Boyd, General Manager
Paul Cook, Operations Manager
Connor Boyd, Operations Coordinator
William Boyd, Operations Assistant
Craig Lyford, Remediation Supervisor
Alex Boyd, Remediation Projects Supervisor
Steve Bowling, Managing Director
Cameron Lornie, Projects Engineer

Recent Projects

Residential Vinyl Asbestos Removal

Residential Vinyl Asbestos Removal

Paihia School Asbestos Removal

Paihia School

Northpower Asbestos Removal

Northpower Asbestos Removal

More Projects...

Our Services

  • Fire Contamination and Emergency Response
  • Demolition of Asbestos Contaminated Structures
  • Asbestos Cladding and Soffits – Removal and Reinstatement
  • Asbestos Contaminated Roofing
  • Textured Ceiling Removal
  • Commercial Asbestos Removal
  • Ground Remediation
  • Industrial Asbestos Removal
  • Asbestos Contaminated Flooring – Vinyl Removal
  • Ceiling Void and Building Void Decontamination and Encapsulation

Systems & Compliance

Bowling Infrastructure Group considers it imperative that all staff return home to their families fit and healthy at the end of each day, the impact of our works on the environment is minimised, and that our projects are constructed to specification, … More info...

Business Units

  • Steve Bowling Contracting
  • SSP Engineering
  • NPM Remediation
  • NPM Construction
  • GHK Piling

© Copyright 2015 Bowling Infrastructure Group, 9-11 Hewlett Street, Port Whangarei · Login

Copyright © 2025 · Bowling Infrastructure Group, 9-11 Hewlett Street, Port Whangarei, 0110 · Email Us · Website Managed By Honey Pot Digital · Log in