Reyburn Medical Centre

NPM Construction worked with the Reyburn Medical Centre developer to re-purpose an existing car dealership showroom and garage and workshop into a full functioning medical centre.  The project involved renovation and upgrade of two existing aged commercial buildings and new build construction to link these buildings into one facility. The floor … [Read more...]

Whangarei Girls High School – Health & PE Classroom Block Construction

NPM Construction tendered and were awarded the contract to build a 301m², three classroom Health & PE Block including break out spaces and toilet facilities (staff, student & accessible). Construction works included reinforced concrete floor foundations, building construction, drainage, concrete pavements, stormwater retention pit, driveway … [Read more...]

100T Boat Haul Out Facility

The project to construct the sheet piled seawall, foundations, pile caps and dredge the seabed for a new 100T rated boat haul for Oceania Marine. The large remote-control operated haul out machine had been purchased and imported but there was a need for the ground work to be established so that the specialised machine could have access out over the … [Read more...]

Residential Retaining Wall

Steve Bowling Contracting Limited were contracted to construct a large retaining wall for a residential client in the Whangarei District to replace an existing failed retaining wall. The site access was very difficult with issues around the access for concrete trucks & pole deliveries. Although a challenging site, the project was very … [Read more...]

Waiarohia Stream Footbridge

Stream Footbridge

SSP Engineering were contracted to the Waiarohia Stream Footbridge project as the main engineering firm who provided all structural & non-structural steel fabrication and installation. The steel componentry on this bridge totalled $0.9million, which was almost half of the total project value. Every piece of the bridge was a bespoke, one … [Read more...]

  • 1
  • 2
  • 3
  • Next Page »

Business Divisions

Steve Bowling Contracting
Phone: (09) 435 2119
Fax: (09) 435 2469
Email: admin@sbc.co.nz

SSP Engineering
Phone: (09) 435 2466
Email: admin@sspengineering.co.nz

NPM Construction
Phone: (09) 435 2457
Email: admin@npmltd.co.nz

NPM Remediation
Phone: (09) 435 9014
Email: admin@npmrem.co.nz

GHK Piling
Phone: (09) 435 4443
Email: admin@ghk.co.nz

Recent Projects

Tutukaka Footbridge

Tutukaka Harbour Walking Bridge

Waiarohia Stream Footbridge – Officially named Kotuitui Whitinga

Te Tii B3 – Waitangi Fire House & Asbestos Removal

More Bowling Group Projects...

What Our Customers Say

  • “We would like to take this opportunity to thank NPM Construction for the outstanding work completed on our recently renovated Block 1. We are very happy with the quality workmanship carried out on this project. We found your staff to be friendly, helpful & professional at all times on site. Read more...
  • “Hockey Northland’s 3rd turf project was started in mid-October of 2013 Steve Bowling Contracting being awarded the main contract. They were able to provide suggestions/solutions to the various problems that arise on a project of this size and some of these suggestions reduced the costs significantly. Read more...
  • “To their credit, the staff of Steve Bowling Contracting worked with the MOE/School (and specific student’s needs), the design team and us as project managers to deliver a project we are all immensely proud of. The team are to be congratulated for completing this project to the agreed programme and budget. Read more...
  • “We were very impressed with how Steve Bowling Contracting took the architects vision and turned this into a reality on site. The fact that the bridge came together without a problem in a challenging marine environment was a credit to the construction team. Read more...

Systems & Compliance

Bowling Infrastructure Group considers it imperative that all staff return home to their families fit and healthy at the end of each day, the impact of our works on the environment is minimised, and that our projects are constructed to specification, … More info...

Business Units

  • Steve Bowling Contracting
  • SSP Engineering
  • NPM Remediation
  • NPM Construction
  • GHK Piling

© Copyright 2015 Bowling Infrastructure Group, 9-11 Hewlett Street, Port Whangarei · Login

Copyright © 2025 · Bowling Infrastructure Group, 9-11 Hewlett Street, Port Whangarei, 0110 · Email Us · Website Managed By Honey Pot Digital · Log in